Home References Main road no. 8 – electric replacements

Main road no. 8 – electric replacements

Várpalota, main road no. 8, ring section – electric replacements

2015/07 - 2015/08

8szFout2

Technical content of the project:

  • Demolition of an out-of-operation MV overhead line in a length of 800 m
  • Re-routing of a MV overhead line in a length of 900 m by setting up 2 pcs. of V12-3550, 1 pc. of V16-4500 typed new steel pole and 3 pcs. of poles type B12-1300
  • Re-routing of a 10kV cable in a length of 250 m
  • Replacement of a 870 m long bare 0.4 kV overhead line with underground cable
  • Establishment of street lighting in a roundabout in a length of 450 m by the setting up of 12 pcs. of poles
  • Changing the place of 5 pcs. of consumer connecting and metering point