Implementation of the high voltage cable replacements for VIV Zrt. in connection to BKV tram line 1 track reconstruction works.
Technical content of the project:
- Reconstruction of high voltage cable sections at triple intersection points
- Preparation of directional drillings up to 500 mm in diameter 161 m
- Dismounting of high voltage cables 1,185 m
- Construction of new cable traces 382 m
- Laying high voltage cables 1,146 m
- Assembly of cable joints 18 units
- High voltage tests prior to commissioning